The planned activity includes:
- construction of gas pipeline DN 700/75 bar
- laying the optical communication system with the associated optical cable that is laid into one of the two protective PEHD pipes that are laid along the gas pipeline, while the other pipe is a spare one
- location of the launching / receiving scraper station DN 800 of the new gas pipeline and block station DN 700 within the existing gas node PČ Zabok MRČ Zabok
- expansion of the existing BIS Jakovlje, within which block station DN 700 of the new gas pipeline will be located as well as a new container for monitoring and control
- construction of block station BS Ivanec DN 700 and location of a new container for monitoring and control
- expansion of the existing BIS Rakitje within which block station DN 700 of the new gas pipeline will be located as well as a new container for monitoring and control
- expansion of the existing gas node PČ Lučko where launching-receiving scraper station of the new gas pipeline will be located, as well as block station DN 700, two gas collectors DN 800, technological impurities tanks and a new container for monitoring and control
- reconstruction of the existing gas pipelines Karlovac - Lučko and Lučko - Ivanja Reka within the area of PČ Lučko with a connection to the collector via measuring lines
- reconstruction of the measuring-reduction line 75 bar/50 bar of the connecting gas pipeline DN 300/50 PČ Lučko - gas pipeline Zagreb west - east DN 500/50
- installation of parts of the cathodic protection system along the gas pipeline route.


Note: Funded by the European Union - NextGenerationEU. Views and opinions expressed are solely those of the author and do not necessarily reflect the official views of the European Union or the European Commission. Neither the European Union nor the European Commission can be held responsible for them.