Zabok – Lučko

The gas pipeline Zabok - Lučko DN 700/75 bar is a closed technological system constructed from steel pipes with a nominal diameter of DN 700 and is dimensioned in accordance with the operating pressure of 75 bar. The entire length of the gas pipeline is constructed as an underground installation, with the exception of the construction of overhead facilities at the sites of installation of block stations (BS), launching and receiving scraper traps (MČS) and gas nodes (PČ). It will pass through the area of the Krapina-Zagorje County, i.e. the area of the towns of Zabok and Oroslavje, then the area of the Zagreb County, i.e. the area of the municipalities of Jakovlje and Bistra, the towns of Zaprešić and Sveta Nedelja, and the area of the City of Zagreb. The route of the planned gas pipeline is 36 km long and is expected to be located almost entirely in the corridor of the existing main gas pipeline Zabok - Zagreb DN 500/50 bar and the main gas pipeline Zagreb west - east DN 500/50 bar.

The planned activity includes: Planned completion of construction: 2nd quarter of 2026




Note: Funded by the European Union - NextGenerationEU. Views and opinions expressed are solely those of the author and do not necessarily reflect the official views of the European Union or the European Commission. Neither the European Union nor the European Commission can be held responsible for them.
Previous topic:
Zabok – Lučko